Product Code Database
Example Keywords: nintendo -ocarina $78
barcode-scavenger
   » » Wiki: Warden Station
Tag Wiki 'Warden Station'.
Tag

Warden is a station on Line 2 Bloor–Danforth of the in , Ontario, Canada. It is located at the southeast corner of St. Clair Avenue East and . The station is located perpendicular to St. Clair Avenue East, and is the only Line 2 station with a north–south alignment. The station opened in 1968 and was the eastern terminus of the line until 1980.


Description
The station building has three levels: the subway platform is on the upper floor, fare gates and the concourse are found above street level, and the pedestrian entrance is on the lower floor. With the closure of the original bus terminal for reconstruction, a temporary bus terminal has been set up in a former parking lot along Warden Avenue on the east side of the station. There is a passenger pick-up and drop-off area on the temporary terminal's south side. A pedestrian path runs along the west side of the station building connecting St. Clair Avenue and the temporary terminal to the station entrance.

920 parking spaces are located at this station for commuter use, all of them in the North Lot on the north side of St. Clair Avenue.


History
Warden station was opened in 1968 in what was then the Borough of Scarborough, and served as the eastern terminus for Line 2 Bloor–Danforth for 12 years until the extension to was completed in 1980.

When the station opened, it had a two-level bus terminal with a concourse on the upper level and nine bus bays at ground level. Each bay had separate stairways for riders to access the concourse, where there would be lighted signs showing the bus route and whether a bus was waiting below on a platform. The concourse had several retail outlets.

Until 1973, TTC buses and subway trains serving the station were in separate fare zones and so the turnstiles and collector booths were placed between the bus bays and the subway platforms. When the zones were abolished, the layout was reconfigured to bring the buses inside the station's fare-paid area; one collector booth, left isolated inside the fare-paid zone, became an information booth.

Work started in 2022 to rebuild the bus terminal and make the station accessible. The station is one of the last subway stations yet to be made accessible, due to the complexity of the station layout and its multiple levels. In November 2023, the south parking lot was closed to convert it into a construction site. A temporary open-air bus terminal opened on January 5, 2025, freeing up the old bus terminal in advance of its demolition and permanent replacement. Elevators within the station are expected to be in service by mid-2025. A new bus terminal is expected to be completed by the end of 2027.


Future redevelopment
A new bus terminal will be built on the site of the original terminal. Designed by Strasman Architects to meet accessibility standards, the new two-level terminal will have 12 street-level bus bays, two elevators, two escalators and space for retail outlets.

Both commuter parking lots at the station are proposed to be redeveloped by the city government. In October 2021, the city announced that agreement had been reached with to build 600 residential units and a child care centre on the north parking lot.


Subway infrastructure in the vicinity
After exiting the station eastbound towards , the track returns to a tunnel at the Chestnut Portal, where it continues on its diagonal alignment under the former Canadian National Railway (CNR) spur line.

There is a crossover west of the station from when it was Line 2's eastern terminus which is still used occasionally to trains. There is also a small siding and storage shed west of the crossover on the south side of the above-ground tracks, which continue along the track bed of the former CNR line all the way to Victoria Park station.


Nearby landmarks
Nearby landmarks include the Providence Healthcare, Warden Woods Park, Warden Hilltop Community Centre and Pine Hills Cemetery. It is near much vacant industrial land (including the former site of Centennial College and Warden Woods Mall/Power Centre) where major redevelopment is expected over the coming years, including numerous new housing developments on the former Power Centre property. It is also near the Toronto District School Board high school WA Porter CI, which brings about 700 students into the station each year.


Surface connections
The temporary bus terminal, opened on January 5, 2025, is accessible to those with disabilities; however, the subway platform will not be accessible until elevators are installed between street level and the subway platform.

The temporary bus terminal is located on the east side of Warden Avenue, south of St. Clair Avenue. The bus bays are numbered from 1 to 8 from south to north. Four of the bays (1, 6, 7, 8) are located on the east curb of Warden Avenue. The other four bays (3, 4, 5, 6) are located in an adjacent, former parking lot. The temporary bus terminal is outside of the station's fare-paid area.

TTC routes serving the station include:

1 !117Birchmount SouthSouthbound to Victoria Park station
2 ! Layover Spot
3 !8BroadviewSouthbound to Hennick Bridgepoint Hospital via O'Connor Drive and Broadview station
4 !69Warden SouthSouthbound to St. Clair Avenue East (Barkdene Hills)
5 !9BellamyNorthbound to Scarborough Centre station
6 !Line 2Shuttle BusWestbound
7 !102AMarkham RoadNorthbound to Progress Avenue / Centennial College
8 !68AWardenNorthbound to Steeles Avenue East


External links
  • , filmed about 3 months prior to the closure of the original (1968) bus terminal

Page 1 of 1
1
Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
10/10 Page Rank
5 Page Refs
1s Time